Engineering review
Drawings, quantities, material grades and fabrication requirements are checked before pricing.

Project service region
Ferotan provides project-based steel construction, fabrication, supply and delivery planning for industrial enquiries across Europe.
Service scope
Ferotan evaluates industrial enquiries across Europe for steel structures, fabricated components, industrial platforms and documented material supply. Each request is reviewed against drawings, quantities, material grades, fabrication scope and the intended delivery location. This page describes a service area and does not imply a local Ferotan branch in every country.
Commercial and technical planning covers project specifications, traceability, export packing, transport constraints and delivery sequencing. Final availability, Incoterms, installation responsibility and compliance documentation are confirmed for each project before a binding offer is issued.
Drawings, quantities, material grades and fabrication requirements are checked before pricing.
Material traceability, fabrication scope, protection system and inspection records are defined per project.
project specifications, traceability, export packing, transport constraints and delivery sequencing are reviewed before the delivery programme is confirmed.
A reliable enquiry starts with the intended use, grid and elevation drawings, load schedules, equipment interfaces, material grades, corrosion environment, fire requirements and the governing project specification. For Europe, project specifications, traceability, export packing, transport constraints and delivery sequencing must be reviewed without assuming a single code, climate value or installation practice for every destination. Final structural actions, national annexes, permits and professional approvals remain the responsibility of the appointed project parties. Existing facilities also require verified dimensions, access routes, live services, shutdown restrictions and safe lifting zones before fabrication drawings can be released. Any quantity, section or performance value that has not been supported by an approved document is identified as preliminary rather than presented as a final design commitment.
The commercial scope separates engineering, material supply, cutting and drilling, welding, surface protection, inspection, export packing, freight, unloading and site installation. Material identity, drawing revision, part mark and inspection record are linked throughout fabrication. The required material certificates, welding quality level, non-destructive examination, dimensional acceptance, coating system and packing marks are agreed before production. No generic web statement is treated as proof of a certificate, stock position or execution class. Where cross-border documentation is required, the language, document format, customs description, country of origin evidence and receiving party responsibilities are included in the deliverables register.
Package dimensions and weights are checked against road or sea transport limits and the actual unloading sequence. Components are grouped by erection zone so that early columns, bracing and connection kits are accessible when the vehicle reaches site. Corrosion protection is shielded from chains, standing water and incompatible packing materials. The delivery programme identifies the agreed Incoterms, customs responsibility, storage conditions, crane and access requirements, temporary stability and local installation interfaces. This page describes a project service area only; it does not claim that Ferotan maintains a branch, warehouse or permanent installation crew in every country within Europe. Feasibility and partner responsibilities are confirmed in the signed quotation.
Please provide dimensioned PDF drawings together with available DWG, DXF, IFC or STEP files, material and coating specifications, quantities, required certificates, delivery address, target programme and the expected installation scope. State the drawing revision and units clearly. If the project is in an operating facility, add photographs, access dimensions, lifting restrictions, working-hour limitations and known hazards. Missing inputs will be recorded as assumptions; final price and lead time are issued only after the technical and commercial boundaries have been reviewed.
Review prices, request a quotation or contact the technical team before finalising your project budget.
Frequently asked questions
Please provide drawings, quantities, material grades, delivery destination, target schedule, required documentation and the expected installation scope.
Delivery can be evaluated by road or sea freight depending on the destination, package dimensions, customs requirements and the agreed Incoterms.
The price depends on steel weight and grades, fabrication complexity, surface protection, inspection documents, packing, freight, local handling and any site installation responsibility.
No. It describes a project service area. Local representation, installation partners and delivery feasibility are confirmed separately for each country and project.
Let us review quantities, material grades, fabrication, export packing, delivery and site responsibilities in one documented scope.
Zorunlu çerezler sitenin güvenli çalışmasını sağlar. Analitik ve pazarlama teknolojileri yalnızca açık izninizden sonra yüklenir.
Çerez politikasını inceleyin